-
Crew entry door.
-
Fuselage interior.
-
Rebuilt main landing gear struts.
-
Added full intakes on engine nacelles, along with exhaust cans.
-
Rebuilt main wheel wells.
-
All antennas replaced and missing ones added (upper and lower).
-
Repositioned elevators.
-
Added static wicks to ailerons, elevators,
and rudders.
-
Cut nose open and built complete PDS antenna, along with landing, and taxi lights.
-
Added trailing wire antenna.
-
Added wind shield wipers.
-
Added GPS antenna.
-
Rebuilt arresting hook.
-
Added tie down points to landing gear, and fuselage.
-
Added wing fold indicators to top of engine nacelles.
-
Added arch antennas to rotodome base.
-
Rebuilt crew compartment cooling generator.
-
Added HF antenna wires.
-
Wheel chocks.
-
Remove before flight flags.
-
Added gold plating to cockpits upper hatches and side windows.
-
Replaced wing tip navigation lights with clear lenses.
-
Built anti-skip pad.
-
Boxed in arresting gear bay.